In January 2015, Lewisham Council unveiled plans for an innovative and flexible housing development devised in collaboration with Rogers Stirk Harbour + Partners (RSHP). The development is a response to the ongoing demand for housing in the Borough, exploring a short-term use for the site of the former Ladywell Leisure Centre building, which was demolished in 2014.
The project creates a deployable, 2,000 m2 development using a volumetric construction method that provides high-quality, energy-efficient accommodation. The system can be built faster and cheaper than traditional methods, and the finished structure is fully-demountable, meaning it can be used over a number of years in different locations.
Residential units provide homes for local people in housing need, whilst ground-floor non-residential units are available for community and business use. All units exceed the current space standard requirements by 10%, helping the Council meet an existing shortfall in high-quality temporary and two-bed accommodation.
Ivan Harbour, Partner at RSHP, said the project: “ ..offers a blueprint to meet a wide range of urban housing needs. By delivering well-designed, flexible and sustainable accommodation using a quick and cost-effective volumetric technology, we hope to change the way we think about house building in the future.”
Sir Steve Bullock, Mayor of Lewisham, said: “This scheme may offer a solution to an all too common problem that plagues many development sites, which often sit unused while complex regeneration plans are put together. When we have thousands of people on our housing waiting list and are paying out for expensive bed and breakfast stays - that is a terrible waste. We are also showing with this partnership with Rogers Stirk Harbour + Partners that we can achieve real quality and value for money.”
On 7 July 2016, the project won the Mayor's Prize and the Temporary building category at the New London Architecture awards.
The scheme was formally launched on 14 July 2016, when Bullock described it as a “...great example of how we can use innovation to respond to this very real and growing challenge.”
Ivan Harbour added, “This type of development can go up to 13 storeys and our only real constraint is the volume you can get on the back of a truck and get round the country. By using offsite construction you can can ship all the material and assemble it locally. It's all about the flexibility of people.”
In February 2017, PLACE/Ladywell was Highly Commended in the 2017 London Planning Awards in the category 'Best new place to live'. The prize was collected by Lewisham Cabinet Member for Housing, Damien Egan.
--RSHP
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Concept architectural design.
- RSHP.
- 8 Chifley.
- Nuovo Centro Civico - Scandicci.
- Y:Cube.
- RSHP move to Leadenhall Building.
- Rogers Stirk Harbour + Partners
[edit] External references
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.